| Due Date | Bid Type | Project | Agency | Description | Eng Est | Minority Goal | View Project |
|---|---|---|---|---|---|---|---|
| 03/03/2026 10:00 AM |
Online | 3rd Street Corridor Widening | Inland Valley Development Agency | Widening of 3rd Street, from Del Rosa Drive to Victoria Avenue. | -$-------------------- | N/A | View Project |
| 03/05/2026 2:00 PM |
Online | Orangewood Avenue Bridge Widening over Santa Ana River | City of Anaheim | The work consists of widening the Orangewood Avenue Bridge over the Santa Ana River, retrofitting existing bridge foundations, installing Santa Ana River improvements, and constructing a new waterline within Orangewood Avenue. The work includes demolition, bridge widening and retaining structures, bike trail reconstruction, fencing, lighting, and paving. | $21,861,437.00 | N/A | View Project |
| 03/11/2026 10:00 AM |
In Person | Cathedral Canyon Sidewalk Improvement Project | City of Cathedral City | The proposed improvements include clearing and grubbing, removal and disposal of existing concrete/asphalt pavement, construction of Portland Cement Concrete (PCC) sidewalk and ADA pathways, PCC monolithic curb, lowering and raising utilities to final grade, and removal and replacement of Desert Water Agency (DWA) water meter boxes. | -$--------------- | N/A | View Project |
| 03/12/2026 2:00 PM |
Online | At Grade Crossing Safety Improv. - N. San Antonio Blvd. | SGVCG | The project work includes, but is not limited to the construction of typical street features such as curb, gutter, sidewalk, pedestrian crossing features including sidewalk ramps, stairs, railing and gates, pedestrian ramps; roadway structural section and roadway reprofiling, hardscape and other ancillary site improvements, miscellaneous utility protection and/or relocation, storm drain modifications, relocation of signs, signing and striping, traffic signal modifications, installation of vehicular and pedestrian railroad safety equipment. | -$----------- | N/A | View Project |
| 03/20/2026 11:00 AM |
Online | Sycamore Avenue Sewer Trunk Line | Veolia Water West Operating Services, Inc. | Project consists of the installation of approximately 5,200LF of 15-inch SDR-26 Heavy Wall sewer trunk line, 54LF of 8-inch force main, potholing for locating services, installation of (14) manholes, and paving per plans. | -$----------- | N/A | View Project |
| 03/25/2026 2:00 PM |
Online | Public Works Dept. Parking Lot | City of Perris | This project includes grading, paving, installing CMU wall, excavation & backfilling, electrical/ lighting, plumbing, PCC drainage facilities, landscaping & irrigation, slurry seal resurfacing, PCC paving and swale works, curb & gutter, signing & striping and other miscellaneous related work across from, in front, and inside of existing Public Works Department Yard on 1015 South G Street, in the City of Perris, CA. | $1,000,000 | N/A | View Project |
| 03/25/2026 3:00 PM |
Online | Storm Drain Improvements at W. Hill Drive | City of San Bernardino | Installation of an 18-inch storm drainpipe on W. Hill Drive between N. Acacia Avenue and N. Mayfield Avenue, including the construction of a headwall at the terminus of the storm drain line. | -$-------------- | N/A | View Project |
Please send quotes to estimating@rivconstruct.com