| Due Date | Bid Type | Project | Agency | Description | Eng Est | Minority Goal | View Project |
|---|---|---|---|---|---|---|---|
| 06/18/2026 12:00 PM |
Online | Racquet Club Road Reconfiguration | City of Palm Springs | The work consists of installing Class II bicycle lanes along Racquet Club Road and North Farrell Drive between North Palm Canyon Drive and Via Escuela, including associated signing, striping, and pavement improvements. The project will reconfigure the existing roadway from four travel lanes to a three‑lane section with one travel lane in each direction, a two‑way left‑turn lane, and strategically located curbside parking. The work shall be diligently prosecuted to completion before the expiration of 40 Working Days. | $3,800,000 | N/A | View Project |
| 06/24/2026 2:00 PM |
In Person | Bartlett Parking Lot Extension | City of Big Bear | This project generally includes the construction of 2 new public parking lots, including activities such as grading, pulverization and disposal of existing pavement, construction of retaining walls, asphalt concrete (AC) paving, construction of curb and gutter, construction of sidewalks, storm drain improvements, installation of site and street lighting, landscaping, irrigation equipment and other appurtenant work. | -$-------- | N/A | View Project |
| 07/01/2026 2:00 PM |
Online | Granite Hill Area Safe Routes to School Sidewalk Gap Closure | City of Jurupa Valley | The work will take place on various streets as listed, but not limited to: Granite Hill Drive (from Lindsay Street to Hunter Street), Lindsay Street (from Ben Nevis Boulevard to Mission Boulevard) , Campbell Avenue (from Ben Nevis Boulevard to Mission Boulevard), Hastings Boulevard (from Campbell Avenue to Hunter Street). The project consists of AC pavement rehabilitation by primarily, but not limited to, the grind and overlay or removal and replacement of existing AC pavement and reconstruction of the existing roadway including, but not limited to, new concrete curb, gutter, sidewalk, catch basins, storm drain, driveway approaches/driveways, and ADA access ramps, thermoplastic striping and pavement markings; traffic control and other related work as described in the Specifications and Contract Documents. | $6,391,000 | N/A | View Project |
| 07/22/2026 2:00 PM |
Online | 08-1N6104 (Corona, Ca.) | Caltrans | Construction on State Highway in Riverside County in Corona from 0.2 Mile North of Ontario Avenue Undercrossing to Old Temescal Road Undercrossing. District-County-Route-Post Mile: 08-Riv-15-38.9/39.4 | $7,900,000 | N/A | View Project |
Please send quotes to estimating@rivconstruct.com