| Due Date | Bid Type | Project | Agency | Description | Eng Est | Minority Goal | View Project |
|---|---|---|---|---|---|---|---|
| 07/16/2026 2:00 PM |
Online | Etiwanda Ave. to Slover Ave./Airport Drive Improv. | City of Fontana | The project will be to improve the operation at the intersection of Etiwanda Ave and Airport Dr/Slover Ave. There is a large volume of truck traffic which uses this intersection causing significant traffic delays for vehicles traveling to and from I-10. The project is located at the Intersection of Etiwanda Ave and Airport Dr/Slover Ave about 2000’ south of I10/Etiwanda Ave interchange. It is situated along the border of City of Fontana and City of Ontario. The proposed improvements at this intersection include street widening, retaining walls and median construction to accommodate an additional northbound through lane and creation of dual left and/or dual right turn lanes for various approach legs of Etiwanda Ave and Airport Dr/Slover Ave. Traffic signal modification, drainage improvements, water system upgrades and private property reconstruction will be required for the widening improvements. The project will construct missing sidewalk and streetlights along the limits of construction to improve pedestrian access and safety. | $13,500,000.00 | N/A | View Project |
| 07/22/2026 2:00 PM |
Online | 08-1N6104 (Corona, Ca.) | Caltrans | Construction on State Highway in Riverside County in Corona from 0.2 Mile North of Ontario Avenue Undercrossing to Old Temescal Road Undercrossing. District-County-Route-Post Mile: 08-Riv-15-38.9/39.4 | $7,900,000 | N/A | View Project |
| 07/23/2026 2:00 PM |
Online | Redlands Avenue REBID | Webb & Associates | Off-site frontage improvements for development along Redlands Avenue in the City of Perris. The project consists of street improvements on Redlands Avenue south of Rider Street and North of Placentia Avenue to provide median, curb, pavement, driveways, utilities, street lighting, signing & striping and landscape improvements. | $ | N/A | View Project |
| 07/29/2026 2:00 PM |
In Person | Granite Hill Area Safe Routes to School Sidewalk Gap Closure | City of Jurupa Valley | The work will take place on various streets as listed, but not limited to: Granite Hill Drive (from Lindsay Street to Hunter Street), Lindsay Street (from Ben Nevis Boulevard to Mission Boulevard) , Campbell Avenue (from Ben Nevis Boulevard to Mission Boulevard), Hastings Boulevard (from Campbell Avenue to Hunter Street). The project consists of AC pavement rehabilitation by primarily, but not limited to, the grind and overlay or removal and replacement of existing AC pavement and reconstruction of the existing roadway including, but not limited to, new concrete curb, gutter, sidewalk, catch basins, storm drain, driveway approaches/driveways, and ADA access ramps, thermoplastic striping and pavement markings; traffic control and other related work as described in the Specifications and Contract Documents. | $6,391,000 | N/A | View Project |
| 08/19/2026 2:00 PM |
In Person | Avenue 50 Bridge Construction | City of Coachella | The project consists of the realignment and widening of Avenue 50, expanding the existing two-lane roadway to a four-lane arterial facility, together with the realignment of Tyler St. on the west side of the Coachella Valley Stormwater Channel (CVSC). The scope of work includes construction of a new five-span bridge over the CVSC (Whitewater River); removal and reconstruction of concrete slope protection; removal and reconstruction of the CV/Link mulimodal pathway; installation of new waterlines; street improvements; new traffic signal system at Ave. 50/Tyler St.; and all traffic striping and signs. | $ | N/A | View Project |
Please send quotes to estimating@rivconstruct.com