Riverside Construction's Bid Schedule

Subcontractors: Please be sure to submit CARB certificates

Due Date Bid Type Project Agency Description Eng Est Minority Goal View Project
08/19/2026
2:00 PM
Online Third Street Grade Separation at BNSF Railroad City of Riverside The project generally includes the construction of an underpass at the location of Third Street and the BNSF tracks. The project consists of, but is not limited to, the following major activities: • Construction of a quadruple track concrete bridge structure. • Construction of retaining walls. • Excavation and grading of Third Street for approximately 1,340 feet, from approximately 400 feet west of the BNSF crossing to approximately 940 feet east of the BNSF crossing. • Construction of a new roadway pavement along Third Street, including concrete curbs, gutters, sidewalks, wheelchair ramps, driveways and retaining walls. • Reconfiguration of local streets. • Relocation, reconstruction and realignment of wet and dry utilities, including, but not limited to, the Riverside Canal. • Construction of storm drain pipes, catch basins, and a new pump station. • Construction of a storm water detention basin. • Reconstruction/Modification of existing traffic signals. • Installation of landscaping and irrigation improvements. • Installation of new traffic signing and striping. • Demolition and removal of buildings and improvements on two (2) parcels that have been acquired, by the City, for the project. $43,426,081 N/A View Project
08/19/2026
2:00 PM
In Person Avenue 50 Bridge Construction City of Coachella The project consists of the realignment and widening of Avenue 50, expanding the existing two-lane roadway to a four-lane arterial facility, together with the realignment of Tyler St. on the west side of the Coachella Valley Stormwater Channel (CVSC). The scope of work includes construction of a new five-span bridge over the CVSC (Whitewater River); removal and reconstruction of concrete slope protection; removal and reconstruction of the CV/Link mulimodal pathway; installation of new waterlines; street improvements; new traffic signal system at Ave. 50/Tyler St.; and all traffic striping and signs. $54,500,000 N/A View Project

Please send quotes to estimating@rivconstruct.com