| Due Date | Bid Type | Project | Agency | Description | Eng Est | Minority Goal | View Project |
|---|---|---|---|---|---|---|---|
| 07/29/2026 2:00 PM |
In Person | Granite Hill Area Safe Routes to School Sidewalk Gap Closure | City of Jurupa Valley | The work will take place on various streets as listed, but not limited to: Granite Hill Drive (from Lindsay Street to Hunter Street), Lindsay Street (from Ben Nevis Boulevard to Mission Boulevard) , Campbell Avenue (from Ben Nevis Boulevard to Mission Boulevard), Hastings Boulevard (from Campbell Avenue to Hunter Street). The project consists of AC pavement rehabilitation by primarily, but not limited to, the grind and overlay or removal and replacement of existing AC pavement and reconstruction of the existing roadway including, but not limited to, new concrete curb, gutter, sidewalk, catch basins, storm drain, driveway approaches/driveways, and ADA access ramps, thermoplastic striping and pavement markings; traffic control and other related work as described in the Specifications and Contract Documents. | $6,391,000 | N/A | View Project |
| 08/19/2026 2:00 PM |
In Person | Avenue 50 Bridge Construction | City of Coachella | The project consists of the realignment and widening of Avenue 50, expanding the existing two-lane roadway to a four-lane arterial facility, together with the realignment of Tyler St. on the west side of the Coachella Valley Stormwater Channel (CVSC). The scope of work includes construction of a new five-span bridge over the CVSC (Whitewater River); removal and reconstruction of concrete slope protection; removal and reconstruction of the CV/Link mulimodal pathway; installation of new waterlines; street improvements; new traffic signal system at Ave. 50/Tyler St.; and all traffic striping and signs. | $ | N/A | View Project |
Please send quotes to estimating@rivconstruct.com